Avoid heat-related delays and cracks when pouring concrete

Uncertain conditions can greatly impact even the best laid construction plans. Placement temperature is especially critical for pouring concrete in extremely hot weather conditions and fluctuations can cause production delays and concrete cracking. If you are struggling with the limitations of chilled water and ice, liquid nitrogen injection is the ideal alternative for handling demanding cooling requirements and pour temperature specifications.

Cool concrete with liquid nitrogen injection from Airgas

If you’re following ACI 305 guidelines for pouring concrete, liquid nitrogen injection can help you achieve and maintain demanding pour temperature specifications in extremely hot weather.

ChillRight® and CryoCrete™ liquid nitrogen

Balaji Hume pipes

Hume pipes

RCC Hume Pipes

Reinforced Concrete Cement Pipes

RCC Manhole Covers

This post was originally published on this site